Certification

Certification records with clear product scope

Review each certificate, report and factory document against the item number, configuration, version and stated applicability.

Review document types
VERIFICATION PATH
  1. 01Product
  2. 02Configuration
  3. 03Record
  4. 04Version
  5. 05Scope
  6. 06Review
01

Product evidence

Certification must match the exact product

REVIEW AREAACOUSTIC PODSOUTDOOR KITCHENSMOBILE TOILETSIdentity

Item number, model and configuration

Agreed unit and component scope

Model, fixtures and intended system

Documents

Factory records, reports and manuals

Material and technical documents

Factory, technical and service records

Verification

Test method and stated conditions

Supplier and configuration scope

Product and destination requirements

02 / Document register

Read the document type before relying on it

A factory release certificate, an independent test report and a technical manual each support different decisions.

DOCUMENTPRODUCT LINKVERSIONREVIEW

Document set reviewed against the confirmed item and project requirement

03 / Record check

Make document review traceable

01Product

Item number, product name and specification

02Source

Issuer and document type

03Version

Issue date, revision and stated status

04Scope

Configuration, method and conditions

05Decision

Applicable project requirement

04 / Factory release

Match the release record to the final order

Factory release records should identify the supplied item and inspection scope. They do not replace independent certification unless a named third-party record is supplied.

Shipment documents

Keep the handover file aligned with delivery

Packing, item, destination and delivery documents are reviewed against the confirmed order and receiving requirement.

05 / Responsibility boundary

Keep certificate roles distinct

Factory certificate

Records the product and inspection scope stated by the factory.

Third-party report

Applies only to its named test method, sample and conditions.

Buyer

Confirms the target-market and project evidence requirement.

Local authority

Determines any local approval or compliance requirement.

Project team

Matches documents to the final item and delivery scope.

06 / Certification request

Discuss the records needed for your product

Does a factory release certificate equal third-party certification?

No. A factory release certificate records the factory scope stated on that document. Independent certification requires a named third-party certificate or report with its own applicable scope.

What should be shared for a document review?

Share the item number, intended configuration, destination, required standard or buyer requirement, and target timing.

Request Certification Review